Patiala, Jun 23: With the demand for power in Punjab peaking amid the sweltering summer, hovering at 15,200 MW, a unit of the Talwandi Sabo Power plant and Ropar Power plant have once again gone out of operation.
© 2024 Northlines. All Rights Reserved. Powered by Rodiex Services LLP
